Sign in to Pitch Co-Worker
Role-based authentication for corporate event pitching.
Portfolio Analytics Dashboard
Overview of active commercial pitches, implemented contracts, and turnaround metrics.
| Ref ID | Client & Summit Title | Venue | Contract Value | Gross Margin | Status |
|---|---|---|---|---|---|
| WON-2026-01 |
Standard Chartered Bank
Private Banking Regional Retreat
|
Capella Singapore | SGD $280,000 | 38.2% | Implemented |
| WON-2026-02 |
Citibank Singapore
Global Wealth Management Gala
|
The Ritz-Carlton Millenia | SGD $410,000 | 36.5% | Implemented |
| WON-2025-03 |
BlackRock APAC
Institutional Investor Forum
|
Marina Bay Sands Hall B | SGD $350,000 | 39.1% | Implemented |
Commercial Pitch Directory
Explore active tenders and implemented contracts in grid or list layout.
Stage 1: Brief Ingestion & Intelligence
Multimodal document parsing and automated client digital intelligence.
Stage 2: Concept Direction & Slide Outline
Thematic concept framing and automated PowerPoint presentation skeleton.
Stage 3: 3D CAD/CAM Spatial Studio
Interactive 3D model, perimeter boundary validation, and Marina Bay Sands collision check.
| Parameter | Limit | Model | Status |
|---|---|---|---|
| Ceiling Height | 7.00m | 6.20m | +800mm PASS |
| Floor Load | 12.0 kN/m² | 4.8 kN/m² | PASS |
| Cargo Elevator | 3.5m x 4.0m | Modular Flats | PASS |
| Rigging Load | 6.0T Bay | 4.2T Total | Advisory (PE) |
Stage 4: Operations Costing & Statutory Compliance
Automated Bill of Quantities (BOQ) with SharePoint pricing and Singapore BCA/EMA regulations.
| Component | Category | Quantity | Pricing Source | Cost (SGD) |
|---|---|---|---|---|
| Custom 18m Curved Timber Backdrop & Fins | Fabrication | 1 Lot (18m x 6.2m) | Custom RFQ | $58,000 |
| P2.6 Ultra-HD Curveable LED Video Canvas (12m x 4.5m) | AV & Tech | 120 Panels | SharePoint Catalog | $42,000 |
| Heavy-Duty Aluminum Box Truss Grid (400mm x 400mm) | Staging | 68 Linear Meters | SharePoint Catalog | $18,500 |
| Concert Line-Array Audio & Intelligent Lighting Package | AV & Tech | 1 Package | SharePoint Catalog | $38,000 |
| 12 Modular Sponsor Exhibition Kiosks | Fabrication | 12 Units | Custom RFQ | $36,000 |
| Midnight Load-In, Riggers & Teardown Crew | Logistics | 1 Lot | Standard Operations | $24,000 |
| BCA PE Endorsement & EMA LEW Certification Fees | Compliance | 2 Statutory Certs | Statutory Engine | $5,700 |
| Total Base Production & Compliance Cost: | SGD $222,200 | |||
Stage 5: Commercial Governance & Export
Margin calibration, regional parity, and 1-click deliverable exports.
Executive Summary (Singapore HQ): Integrated tender proposal for the Standard Chartered FinTech Summit 2026 at Marina Bay Sands Hall A. Features an 18-meter custom curved timber backdrop with BCA PE endorsement, P2.6 curveable LED wall, and 12 modular sponsor kiosks. The commercial price provides a 37.4% gross margin while leaving SGD 94,736 headroom under the client's budget ceiling.
#SCB-90214-TAMPER-EVIDENT · Zero data retention.
Settings & Governance
Role-Based Access Control (RBAC) and Singapore statutory rules engine configuration.
| User ID | Full Name & Email | Designated Role | Department | Gating Sign-off Authority | Status |
|---|---|---|---|---|---|
| USR-01 |
Michelle Tan
michelle@agency.sg
|
Senior Planning Strategist | Planning & Client Strategy | Gate 1: Concept Verification | Active |
| USR-02 |
Adi Nugroho
adi@agency.sg
|
Senior 3D / Spatial Designer | Creative & Spatial Studio | Gate 2: Spatial Feasibility | Active |
| USR-03 |
Wei Lin Koh
weilin@agency.sg
|
Operations & Costing Executive | Event Operations & Procurement | Gate 3: Pricing & PE/LEW | Active |
| USR-04 |
Marcus Chen
marcus@agency.sg
|
Managing Director | Executive Directorate | Gate 4: Final Commercial Sign-off | Active |